Skip to content

Tier III: Perfect-model experiments (CESM2, MPI-ESM, GISS) #95

Description

@duncanwp

Description

Test whether data-driven models can predict the future climate of existing ESMs when trained on their present-day output.

Specification

  • Train on ESM historical output (pre-2015), predict SSP2-4.5 future
  • CESM2 (ECS ≈ 5.2 K): required for ML models — hardest test
  • MPI-ESM (ECS ≈ 3.63 K): extended
  • GISS ModelE2 (ECS ≈ 2.31 K): extended
  • Evaluate using same Tier II metrics
  • Models used for training must have been initialized before the test period (no data leakage)

Required simulations

Perfect model × 3 ESMs (~85 years each)

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions