Skip to content

Stable 26.3 CI/CD Maintenance#1922

Merged
MyroTk merged 7 commits into
stable-26.3from
cicd-fixes/26.3-stable
Jun 23, 2026
Merged

Stable 26.3 CI/CD Maintenance#1922
MyroTk merged 7 commits into
stable-26.3from
cicd-fixes/26.3-stable

Merge branch 'stable-26.3' into cicd-fixes/26.3-stable

a766c9a
Select commit
Loading
Failed to load commit list.
DCO-2 / DCO succeeded Jun 23, 2026 in 1s

Check passed!

All commits are signed off, the check passed.

Summary


Sha Message Pass or fail reason
🟢 b4fbc99 Merge pull request #1261 from Altinity/builds/stab... Skipped: sign-off not required for members
🟢 a3f376c maintenance changes Skipped: sign-off not required for members
🟢 fcd3b43 formatting Skipped: sign-off not required for members
🟢 6de9f09 use gh artifacts Skipped: sign-off not required for members
🟢 bab44e0 fix regression arm tests running Skipped: sign-off not required for members
🟢 0b64ff0 fallback for module import Skipped: sign-off not required for members
🟢 a766c9a Merge branch 'stable-26.3' into cicd-fixes/26.3-st... Skipped: sign-off not required in merge commit