Skip to content

Add base2sol interactive frontend to Base-Solana bridge docs#1638

Open
mrtdlgc wants to merge 1 commit into
base:masterfrom
mrtdlgc:add-base2sol-frontend
Open

Add base2sol interactive frontend to Base-Solana bridge docs#1638
mrtdlgc wants to merge 1 commit into
base:masterfrom
mrtdlgc:add-base2sol-frontend

Add base2sol interactive frontend

55d8a19
Select commit
Loading
Failed to load commit list.
StepSecurity Actions Security / StepSecurity Required Checks succeeded Jun 18, 2026 in 0s

StepSecurity Required Checks

Finished StepSecurity Required Checks

  • NPM Package Cooldown Check - Fails if any package version in the PR was released within the configured cooldown period, helping to avoid brand-new (and potentially unreviewed or malicious) releases
  • NPM Compromised Packages Check - Checks for compromised npm package versions in the PR

Details

✅ NPM Compromised Packages Check

No Compromised npm packages are added in current PR.

✅ NPM Package Cooldown Check

No npm package upgrades to recent releases found in current PR.