Skip to content

Pull requests: openshift/sippy

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Fix timezone bug in ParseCRReleaseTime ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3676 opened Jun 24, 2026 by mstaeble Contributor Loading…
2 tasks done
Move release metadata from BigQuery to PostgreSQL do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#3674 opened Jun 23, 2026 by mstaeble Contributor Draft
5 tasks done
[WIP] Add 14-day time bound to failed-tests matviews do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#3651 opened Jun 18, 2026 by mstaeble Contributor Draft
3 of 4 tasks
[WIP] Replace failed-tests matviews with direct partitioned query do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3647 opened Jun 17, 2026 by mstaeble Contributor Draft
3 of 4 tasks
Check GORM query errors instead of silently returning empty results
#3646 opened Jun 17, 2026 by mstaeble Contributor Loading…
3 of 4 tasks
MPICT: Onboard Chaos variants for OCP 4.22 do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3624 opened Jun 15, 2026 by oharan2 Contributor Loading…
OCPQE-32065: Proposed Implementation for Spot Check Jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#3612 opened Jun 11, 2026 by dgoodwin Contributor Loading…
Fix null Explanations causing regressed tests modal crash needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3605 opened Jun 10, 2026 by redhat-chai-bot Contributor Loading…
OCPNODE-4125: Promote non-techpreview disruptive longrunning jobs to standard tier for component readiness jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3537 opened May 18, 2026 by QiWang19 Member Loading…
Make BGP jobs standard do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3503 opened May 6, 2026 by tssurya Contributor Draft
Remove osde2e rosa-hcp nightly job from customizations needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3501 opened May 6, 2026 by smarthall Member Loading…
1 task
SREP-4417: Config-driven overview customization for rosa-stage jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3465 opened Apr 23, 2026 by dustman9000 Member Loading…
5 tasks
Update pkg/api/README.md to align with current codebase ok-to-test Indicates a non-member PR verified by an org member that is safe to test. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3407 opened Apr 6, 2026 by redhat-chai-bot Contributor Loading…
Test PR Please Ignore needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#3395 opened Apr 1, 2026 by dgoodwin-devin Loading…
WIP: add diagram that details the dataflow in component-readiness approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#3262 opened Feb 11, 2026 by smg247 Member Draft
ProTip! Follow long discussions with comments:>50.