Skip to content

ONT-2c: in-house OWL 2 EL writer; TBox check via the oracle, advisory #4071

Description

@noahgift

Aprender-side row of the ontology spec, which the operator requires finished in 0.70: "the ontology spec MUST be finished in .7" (verbatim, relayed by the cop aprender-cf).

Row (paiml/infra docs/specifications/paiml-ontology.md:599), verbatim: ONT-2c aprender · "ONT-2c: in-house OWL 2 EL writer; TBox check via the oracle, advisory" · depends_on ONT-2b, ONT-0 · K̂ 120

  • depends_on: ONT-2b, ONT-0
  • K̂: 120
  • state: READY (the cop is staffing it)

Row-level ticket; the umbrella rows are #3269 (ONT-001: aprender owns the untriaged rows) and #3559. Filed from infra-83's measured baseline of UNBOUND aprender rows.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    ont-0.70Ontology spec work that must finish in 0.70 (operator 2026-09-23)

    Type

    No type

    Projects

    No projects

      Milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions