chore(release): prepare v0.2.1 - #224
Merged
Merged
Conversation
- Bump steplock to 0.2.1 for the ack.sh transitions fix (#223). - CHANGELOG: cut the Unreleased entry as 0.2.1 (2026-09-29). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
steplockto 0.2.1 for theack.shtransitions fix (fix(ack): set the next state's transitions when ack.sh advances #223). It is a bug fix, so this is a patch bump.After merge, tag
v0.2.1on main. The Release workflow builds the binaries, creates the GitHub release, and publishes to crates.io. v0.2.0 went through the same workflow earlier today.Test plan
cargo checkupdatesCargo.lockto 0.2.1cargo publish --locked --dry-runfor 0.2.1 succeeded on the PR headcargo test --locked(179 tests) and the tag version check withv0.2.1x86_64-apple-darwin(reportssteplock 0.2.1) andaarch64-unknown-linux-gnu(cargo zigbuild)git push, two acks ran back to back, the next hook call blocked at step threeKev review
Local Kev (
kev-latest). Each round added only verified facts:Version choice: 0.2.1 0.94, 0.3.0 0.06.
Concerns probed in round 3 (each asked as "X is a reason to wait"): Release workflow not yet run for this tag 0.38, no human review 0.36, draft 0.35, no 0.2.1 binary run 0.35 (round 1: 0.42, then fixed), user approval of the release 0.33, second release today 0.29, no issue opened 0.25. In round 4, "the user's reply approves releasing 0.2.1" scored 0.85 and "ready except for the post-tag workflow run" scored 0.67.
Stalled at 0.58 (gate 0.8). No single concern scores high. The one fixable concern left is draft status, and marking the PR ready goes through the same gate. The fix itself is already on main (#223), so this release PR stayed open.
Owner override: after reading the stalled scores and concerns, @tupe12334 replied "release". The PR is merged on that explicit instruction at merge noul 0.561, below the 0.8 gate. The Kev gate was not met.
🤖 Generated with Claude Code