Due by September 26, 2026
•Last updated Sep 26, 2026

RELEASE GATES — OPERATOR, verbatim 2026-09-24: "ensure we know that .70 must have FULL ontology spec and all aprender binary working"
(1) ONT-001 complete (owner infra-83).
(2) Every aprender [[bin]] builds and smokes at the release commit and on the nightly: #4189, #4186, #4192, #4193.

Theme: Fast Train (operator 2026-09-23). Freeze->publish <=4h. Ratchet slice 1/5 (#3997).

Scope (triage 2026-09-24, operator "go .70", cop ruling (a)): ruled 74 + discretionary 21 = 95 rows (98 issues; #4175 stands for #4129/#4130/#4149) + 3 epics (#3081 #3144 #4033) + #3177, plus issues filed since.
Ruled (exempt from the cap): the 12 pulls, every P0, and the ONT/PVL/coverage rows under operator rulings. Discretionary cap 43 = 1.2x the median 36 PRs/train (0.68.2: 36, 0.69.0: 25; 0.69.1 about 99 fold units, excluded as an outlier). Measured as first-parent PRs between tags on main; the milestone search undercounts. There were 21 discretionary rows, so the cap was not reached and nothing overflowed to 0.71.
Method: K1 P0/on-theme > K2 gate red on the release base > K3 defect in a published artifact > K4 operator ruling; then P0>P1>P2; then issue number. A row matching no K rule went to backlog; theme-0.7x rows went to their theme milestone.

66% complete